GENERAL CARE

Before shutting down at the end of each shift, we recommend the following procedures :

  1. Flush Hammer with air/ water for a few minutes, then turn off water injection.
  2. Flush Hammer with air/oil for a few minutes. This will coat the internal Hammer parts preventing corrosion / rust.
  3. Never leave the tool in a wet/ muddy hole. Pull back from bottom as far as necessary to prevent the Hammer sitting under water.
  4. It is also good practice to pour at least half a litre of oil down the drill at start up of a new shift.
  5. If the Hammer is removed from the drill rig for any reason, it is wise to pour a quantity of oil into it and block both ends, providing the flushing      as outlined in steps one and two above have been carried out. If steps one and two have not been carried out the Hammer should be stripped,     cleaned and oiled before being stored.

#
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
Component Name
Piston Case/ Std Barrel
Std Piston
Std Std Seat Valve
Std Std Chest Valve
Std Liner
Top Sub / Std Back Head
Driver Sub/ Std Front Chuck
Std Flapper Valve
Std Valve Guide
Guide Sleeve/ Std Assembly Bush
Bit Retainer Ring/ Std Bit Lock
Dart / Std Check Valve
Std Check Valve Cap
Retainer Pin/ Std Dowell Pin
Std Spring
Std Washer
Std Stem Bush
O Ring/ Std Bit Lock O Ring
Std Blocking Choke
Std Front Chuck Rubber Cap
Std Back Head Rubber Cap
H45P
HB45P
HP45P
HSV45P
HCV45P
HL45P
HC45P
HFC45P
HFV45P
HVG45P
HAB45P
HBL45P
HCKV45P
HCVC45P
HDP45P
HS45P
HMW45P
HSB45P
HBR45P
HBC45P
HFCRC45P
HCRC45P
H45PLT
HB45PLTLT
HP45PLT
HSV45PLTLT
HCV45PLTLT
HL45PLT
HC45PLT
HFC45PLT
HFV45PLT
HVG45PLT
HAB45PLT
HBL45PLT
HCKV45PLT
HCVC45PLT
HDP45PLT
HS45PLT
HMW45PLT
HSB45PLT
HBR45PLT
HBC45PLT
HFCRC45PLT
HCRC45PLT
H45PS
HB45PS
HP45PS
HSV45PS
HCV45PS
HL45PS
HC45PS
HFC45PS
HFV45PS
HVG45PS
HAB45PS
HBL45PS
HCKVC45PS
HCVC45PS
HDP45PS
HS45PS
HMW45PS
HSB45PS
HBR45PS
HBC45PS
HFCRC45PS
HCRC45PS

# Hammer Name Part Number Outside Dia (mm) Recomm Bit size (mm) Top Sub Thread (IN) Ham. Wt. Without Bit (kg.) Total Len without Bit (mm) Wrench Flat (mm) Working Pressure (Bar)
1 P45 Hammer H45P 96.00 114.30 - 130.00 2-3/8 Reg box 42.00 994.0 74.0 7.5 - 14.5
2 P45 LT Hammer H45PLT 96.00 114.30 - 130.00 2-3/8 Reg box 44.00 1070.0 74.0 7.5 - 14.5
3 P45 Sup. Hammer H45PS 96.00 114.30 - 130.00 2-3/8 Reg box 43.50 1044.0 74.0 7.5 - 14.5

SPECIAL FEATURES

  1. For use in hard rock application
  2. Suitable for Horizontal & Vertical drilling Operations
  3. Excellent under water characteristics
  4. Able to work on any strata
  5. Less maintenance